|
Detecting Community Structures Within Complex Networks Using a Discrete Unconscious Search Algorithm
|
Written by Dr.Najat Almasarwah |
Hits: 596
|
|
Multi-objective scheduling in labor-intensive manufacturing systems
|
Written by Dr.Najat Almasarwah |
Hits: 654
|
|
A two-phase algorithm to solve a 3-dimensional pallet loading problem
|
Written by Dr.Najat Almasarwah |
Hits: 708
|
|
Minimizing the number of tardy jobs on identical parallel machines subject to periodic maintenance
|
Written by Dr.Najat Almasarwah |
Hits: 619
|
|
Flexible flowshop design in cellular manufacturing systems
|
Written by Dr.Najat Almasarwah |
Hits: 620
|
|
Product Scheduling in a Flowshop Cell
|
Written by Dr.Najat Almasarwah |
Hits: 677
|
|
Minimizing Average Flow Time subject to Minimum Number of Cells and No Tardy Jobs
|
Written by Dr.Najat Almasarwah |
Hits: 618
|
|
Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems
|
Written by Dr.Najat Almasarwah |
Hits: 657
|
|
Jordan Energy Sector Choices and Challenges
|
Written by Malek Khalaf Albzeirat |
Hits: 672
|
|
Literature Review: Lean Manufacturing Assessment During the Time Period (2008-2017)
|
Written by Malek Khalaf Albzeirat |
Hits: 685
|