Multi-objective scheduling in labor-intensive manufacturing systems
|
Written by Dr.Najat E Almasarwah |
Hits: 213
|
A two-phase algorithm to solve a 3-dimensional pallet loading problem
|
Written by Dr.Najat E Almasarwah |
Hits: 212
|
Minimizing the number of tardy jobs on identical parallel machines subject to periodic maintenance
|
Written by Dr.Najat E Almasarwah |
Hits: 216
|
Flexible flowshop design in cellular manufacturing systems
|
Written by Dr.Najat E Almasarwah |
Hits: 239
|
Product Scheduling in a Flowshop Cell
|
Written by Dr.Najat E Almasarwah |
Hits: 215
|
Minimizing Average Flow Time subject to Minimum Number of Cells and No Tardy Jobs
|
Written by Dr.Najat E Almasarwah |
Hits: 225
|
Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems
|
Written by Dr.Najat E Almasarwah |
Hits: 217
|
Jordan Energy Sector Choices and Challenges
|
Written by Malek Khalaf Albzeirat |
Hits: 213
|
Literature Review: Lean Manufacturing Assessment During the Time Period (2008-2017)
|
Written by Malek Khalaf Albzeirat |
Hits: 224
|
A Novel Mathematical Logic for Improvement Using Lean Manufacturing Practices
|
Written by Malek Khalaf Albzeirat |
Hits: 225
|